Vertical Alignments
The full definitions for terms included in this article (listed below) can be found in the HKP Glossary.
-
- Crest vertical curve
- Sag vertical curve
- Headlight sight distance
Vertical curves have a parabolic shape and are constructed to establish a transition from one grade to another while adhering to stopping sight distance (SSD) requirements (FHWA). The parabolic shape ensures the rate at which the grade changes between successive points on the curve remains constant for equal increments of horizontal distance. Well-designed vertical curves allow drivers to have a clear view of the roadway ahead, enhance vehicle control, are aesthetically appealing, and help provide adequate roadway drainage. Figure 1 shows crest and sag vertical curves. A crest vertical curve is concave-down, and a sag vertical curve is concave-up.
Figure 1 Geometry of Crest and Sag Vertical Curves
A vertical alignment consists of tangent grade sections and vertical curves. On roadway profiles, positive grades, or upgrades, slope up from the lower left to upper right (Figure 1, the left side of the crest vertical curve); negative grades, or downgrades slope downward from the upper left to lower right (Figure 1, the right side of the crest vertical curve). At locations where the roadway grade changes, the extended tangents intersect at the point of vertical intersection (PVI), also referred to as the vertical point of intersection (VPI). The point of vertical curvature (PVC) marks the beginning of the vertical curve, while the point of vertical tangent (PVT) marks the end of the curve where the alignment transitions back to a tangent section. Curve length (L) equals the horizontal distance between a curve’s beginning and ending points along the horizontal alignment. Typically, computed vertical curve lengths are rounded up to the next 10- or 100-ft increment. In general, longer vertical curves are preferred to maintain motorist comfort.
Figure 2 is a sag vertical curve profile from a plan set whose grade varies from -2.90% to +0.40%. The x-axis indicates stationing, and the y-axis shows elevation. The dashed line represents existing topography (groundline), while the solid line is the proposed profile grade line of the roadway surface. Plan sets can position the profile view just below the plan view on the same sheet or on the sheet following the plan view. This makes it easier to visualize the relationship between changes in horizontal and vertical alignments. Note that the vertical alignment uses the same stationing as the horizontal alignment, and the horizontal scale is the same as the plan view. Profile views magnify the vertical scale (usually at a ratio of 10:1) so subtle changes in grade can be detected easily. Equation 1 is used to calculate percent grade.
Figure 2 Plan Set Vertical Profile
Equation 2 offers the simplest way to calculate the length (L) of a vertical curve.
Values of K are based on design speed and SSD and can be retrieved from Table 1 and Table 2 (which are reproduced from the Green Book). Higher K values indicate a longer and flatter vertical curve is needed to achieve a 1% change in grade throughout the curve. Lower K values indicate a shorter, more abrupt vertical curve is needed to achieve this change in gradient. For K values > 167, drainage should be inspected closely to verify gradients are sufficient to direct water off the roadway. The K value is also useful for determining the horizontal distance from the PVC to the high point on crest curves or the low point on sag curves. The point at which the slope equals zero occurs at a distance from the PVC equal to the value of K multiplied by the approach grade (Equation 3).
A common rule of thumb is that the minimum vertical curve length should be at least three times the design speed (in feet). Sections 3 and 4 present additional equations for calculating the lengths of crest and sag vertical curves. If the minimum SSD value is not met, designers may adjust the grades, and/or curve length. Based on Green Book SSD criteria, Table 1 and Table 2 list minimum K values for crest and sag vertical curves.
| Table 1: Design Controls for Crest Vertical Curves (Stopping Sight Distance) | |||
|---|---|---|---|
| Design Speed (mph) | Stopping Sight Distance (ft) | Rate of Vertical Curvature, K (Calculated) | Rate of Vertical Curvature, K (Design) |
| 15 | 80 | 3.0 | 3 |
| 20 | 115 | 6.1 | 7 |
| 25 | 155 | 11.1 | 12 |
| 30 | 200 | 18.5 | 19 |
| 35 | 250 | 29.0 | 29 |
| 40 | 305 | 43.1 | 44 |
| 45 | 360 | 60.1 | 61 |
| 50 | 425 | 83.7 | 84 |
| 55 | 495 | 113.5 | 114 |
| 60 | 570 | 150.6 | 151 |
| 65 | 645 | 192.8 | 193 |
| 70 | 730 | 246.9 | 247 |
| 75 | 820 | 311.6 | 312 |
| 80 | 910 | 383.7 | 384 |
| Source: 2018 Green Book | |||
| Table 2: Design Controls for Sag Vertical Curves (Stopping Sight Distance) | |||
|---|---|---|---|
| Design Speed (mph) | Stopping Sight Distance (ft) | Rate of Vertical Curvature, K (Calculated) | Rate of Vertical Curvature, K (Design) |
| 15 | 80 | 9.4 | 10 |
| 20 | 115 | 16.5 | 17 |
| 25 | 155 | 25.5 | 26 |
| 30 | 200 | 36.4 | 37 |
| 35 | 250 | 49.0 | 49 |
| 40 | 305 | 63.4 | 64 |
| 45 | 360 | 78.1 | 79 |
| 50 | 425 | 95.7 | 96 |
| 55 | 495 | 114.9 | 115 |
| 60 | 570 | 135.7 | 136 |
| 65 | 645 | 156.5 | 157 |
| 70 | 730 | 180.3 | 181 |
| 75 | 820 | 205.6 | 206 |
| 80 | 910 | 231.0 | 231 |
| Source: 2018 Green Book | |||
Equation 4 and Equation 5 may be used to compute crest vertical curve length. Neither equation requires a K value; they both require two inputs — SSD and the absolute value of the algebraic difference in grades. SSD on a crest vertical curve assumes the driver’s eye height (h1) is 3.50 feet and the object height (h2) is 2.00 feet (Figure 3). The vertical component of sight distance is generally measured along the roadway centerline. On roadways that have high design speeds, steep grades, or obstacle-filled terrain that limits visibility, SSD may be longer than the vertical curve length.
Figure 3 Crest Vertical Curve Details
The Green Book includes equations for determining crest vertical curve length if passing sight distance is to be provided on two-lane roadways (Equations 3-46 and 3-47). Under this scenario, both the driver’s eye height (h1) and object height (h2) are set at 3.50 feet. However, in most cases designing crest vertical curves to provide full passing sight distance is not feasible, especially on high-speed facilities. On high-speed roadways without lighting, at night SSD values are greater than visibility distances of low-beam headlights, regardless of vertical curvature.
Equation 6 and Equation 7 are used to compute sag vertical curve length. Headlight sight distance (HLSD) is the key consideration for providing SSD on sag vertical curves. One point worth remembering, however, is that compared to vertical alignment and curve design, headlight illumination does not have a major impact on overall safety performance. This is because at night illumination from other vehicle headlights extends the range of visibility beyond the immediate reach of a single vehicle’s headlight beams. Ideally, sag vertical curves should be long enough for a headlight beam to illuminate a distance approximately equal to the SSD.
Unlike crest vertical curves, HLSD for sag vertical curves is not one of FHWA’s controlling criteria for projects on roadways with design speeds of 50 mph or greater. However, designers should still provide appropriate sight distance and document any significant design limitations or constraints associated with sag vertical curve design.
Designers must also be attentive to the impact of sag vertical curve length on passenger comfort, particularly at higher speeds. When a vehicle drives along a sag vertical curve, gravitational and centripetal forces acting on a vehicle and its passengers combine rather than oppose one another. The vertical curve length required to maintain passenger comfort, according to the Green Book, is equal to half of HLSD. Figure 4 illustrates a sag vertical curve and assumptions that support the establishment of curve length. Specifically, the headlight is 2.00 ft. above the ground surface and the light beam diverges 1 degree upward from the vehicle’s longitudinal axis.
Figure 4 Sag Vertical Curve Details
Because vertical obstructions (e.g., overhead signs, overpasses) may limit sight distance in sag vertical curves, designers must verify sight distances are not restricted in these areas. The best method for conducting sight distance checks is to examine the profile view. Green Book equations 3-53 – 3-56 can also be used to determine appropriate sag vertical curve length at underpasses. When practical, bridge structures should not be located directly above the sag low point because this can restrict sight distance.
Another critical consideration when designing sag vertical curves is providing adequate vertical clearance at underpasses to prevent large vehicles from striking the overpass while also maintaining sufficient drainage at the low point of the curve. Table 3 lists minimum and preferred vertical clearances for multiple roadway types. Specified clearances must be maintained on the traveled way and usable shoulder. Designers also should verify that minimum clearances are preserved on the high sides of superelevated curves.
| Table 3: Minimum Vertical Clearances | ||
|---|---|---|
| Type of Roadway | Minimum Clearance (ft) | Preferred Clearance (ft) |
| Interstate, Federal-aid primary in rural areas | 16.5 | 17.5 |
| Strategic Highway Network | 16.5 | 17.0 – 17.5 |
| All others | 14.5 | 17.0 – 17.5 |
| Note: For rehabilitation/reconstruction work on existing bridges, vertical clearance can be reduced by 0.5 feet from minimum clearances. | ||
Designs for spot improvements (e.g., adding a turning lane or auxiliary lane) often match the existing grade line. This preserves the existing pavement crown, frequently resulting in a non-engineered profile. This non-engineered profile grade is called a spline grade. In urban areas, driveways and entrances may impose constraints. Before developing plans that incorporate a spline grade, designers need to consult with Division of Construction staff to determine if they prefer an engineered profile.
Leveling and wedging and/or milling may be needed. Other factors to consider include existing superelevation, existing pavement drainage, and maintenance of traffic. Vertical separation of existing and proposed grades at crossings and tie-ins is a critical consideration for maintaining traffic patterns. Table 4 lists KYTC’s maximum allowable changes in grade for spline grades where a vertical curve is not preferred. Typically, vertical points of intersection are placed at 20-ft. (urban) or 50-ft. (rural) intervals.
| Table 4: Maximum Change in Grade without Vertical Curve | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| Design Speed (mph) | ||||||||||
| < 35 | 35 | 40 | 45 | 50 | 55 | 60 | 65 | 70 | ||
| Maximum Grade Change (%) | 1.0 | 0.9 | 0.8 | 0.7 | 0.6 | 0.5 | 0.4 | 0.3 | 0.2 | |
Designers must account for the headwater elevation of design storms when developing vertical alignments that traverse water. For the design storm, the calculated headwater elevations should preserve 2 ft. of freeboard. Freeboard is the vertical distance between the water surface upstream of a bridge and the low chord of the bridge (the lowermost portion of the superstructure). The elevation of a bridge’s profile grade should, ideally, equal the thickness of the slab plus the beam depth plus 2 ft. of freeboard. For bridge replacement projects, if possible, keep the design storm headwater elevation for the proposed bridge at a level less than or equal to the design storm headwater elevation for the existing bridge.
On low-volume routes, design storms can be allowed to overtop roadways. If a crossing is designed to accommodate overtopping, designers should consider perching the bridge above the approaches by keeping the approach roadway at a lower elevation than the bridge structure. This prevents overtopping flow from submerging the bridge. In turn, this reduces the likelihood of hydraulic forces and/or drift damaging a bridge structure. Also consider the hydraulic performance, debris passage, and structural robustness of the bridge barrier wall type with the overtopping frequency.
When developing bridge elevation profiles, roadway designers need to work with the drainage designer and structure designer. It is especially important to coordinate vertical alignment changes that impact bridge elevations. This coordination typically occurs via the drainage folder.
The Green Book lists several best practices for designing vertical alignments. These, along with KYTC recommendations, are summarized below.
- Maintain smooth grade lines with gradual changes where possible.
- Design vertical profiles to avoid blocking access to adjoining properties.
- Be mindful of the amount of earthwork required to construct a vertical profile. Aim to balance cut and fill to the greatest extent possible. Significant amounts of earthwork increase construction costs and can negatively impact adjacent land. If a project generates excess material, evaluate material quantities and haul distances on- and off-road to determine if the material could be used to flatten slopes or create false cuts.
- Minor adjustments to the proposed profile grade can significantly affect the amount of cut and fill required for a project. Even small changes in vertical alignment may substantially improve earthwork balance and reduce construction impacts. For more information on earthwork see HKP article Strategies for Balancing Earthwork (coming soon)
- Avoid vertical curves on bridges if possible.
- Avoid profiles with hidden dips. They distort motorist perception and lead drivers to think adequate passing sight distance exists where it does not.
- Avoid broken-back grade lines (i.e., two vertical curves in the same direction separated by a short tangent). One long curve is a better option.
- Consider placing the steepest sections of long grades at the bottom of vertical curves. Flatten grades near the top of the ascent, or interrupt the sustained grade with shorter intervals of flatter terrain.
- Vertical profiles should not impede intersection sight distance.
- Drainage is a critical consideration, especially on sag vertical curves. If the K value is > 167, roadway designers and drainage designers need to closely study the curve design to verify adequate drainage. Superelevation transitions should also not occur in sag vertical curves. This could result in ponding where the superelevation transitions through 0%.
- For sag vertical curves located in cuts, providing adequate drainage is imperative. If possible, avoid locating these curves where steep entrances drain onto roadways.
- If possible, avoid impacts to historic properties, structures, and utilities as these can stretch out project timelines and increase costs. In some cases, minor adjustments to vertical curves can help avoid or reduce these conflicts.
AASHTO 2018 Green Book
- Section 3.4.6 explore vertical curves in detail, providing information on design controls, equations (including for situations where passing sight distance is needed), and best practices.